Search
Now showing items 1-3 of 3
Development of implementation methods of water quality trading policy : using the Hydrological simulation program-Fortran (HSPF)
(University of Missouri--Columbia, 2010)
-fortran (HSPF) was used to estimate the hydrology and sediment loading throughout the Brush Creek, MO watershed for future land use development scenarios between upstream and downstream locations. Brush Creek does not have a proper monitoring station...
An evaluation of pre- and post-timber harvest water quality in low-order streams in the Missouri Ozarks
(University of Missouri--Columbia, 2009)
Missouri Department of Conservation's (MDC) best management practices (BMPs) for Regenerative Oak Clear Cutting (ROCC) practice was evaluated on effectiveness to preserve downstream water quality. Fifteen sites, located on MDC lands in Shannon...
Tensile strength, shear strength, and effective stress for unsaturated sand
(University of Missouri--Columbia, 2006)
It is generally accepted in geotechnical engineering that non-cohesive materials such as sands exhibit no or negligible tensile strength. However, there is significant evidence that interparticle forces arising from capillary ...